| Last Update: 1/20/2012 |
|
|
|
|
|
|
|
RPH: Risk To Public Health; DF: Deteriorated Facility; SR: Systematic Replacement; IOE: Improvement of Operating Efficiency
C: Coordination; EPS: Equitable Provision of Services, Facilities; NEF: New or Expanded Facilities |
|
|
|
|
|
|
|
|
|
Description
|
Priority |
FY 2013
|
FY 2014
|
FY 2015 |
FY 2016 |
FY 2017 |
Comments
|
|
|
|
|
|
|
|
|
|
| Planning Department ($35,000) |
|
|
|
|
|
|
|
| Former Gales Ferry School-Kitchen Incubator Feasibility Study |
|
$25,000
|
|
|
|
|
Potential funding from USDA
|
| Gales Ferry/Route 12 Streetscape Planning |
|
$10,000 |
|
|
|
|
Initial allocation to develop streetscape improvement program (possible State funding) |
|
Planning Commission ($10,000)
|
|
GIS Sinking Fund
|
|
$10,000
|
$10,000
|
$10,000 |
$10,000 |
$10,000 |
|
| Finance Department |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Short term financing (BANs) |
| MIS ($29,700) |
|
|
|
|
|
|
|
| Replacement of Town Hall Network Cabling |
DF (H) |
$10,000 |
|
|
|
|
|
| LRVNA Software Upgrades |
DF (H) |
$9,700 |
|
|
|
|
|
| Computer & Server Replace. Fund |
DF (H) |
$10,000 |
$10,000 |
$10,000 |
$10,000 |
$10,000 |
|
|
Police Department ($593,480)
|
|
Computer Equipment Fund
|
SR(3) |
$5,000
|
$5,000
|
$5,000 |
|
|
|
| Everbridge System |
IOE (2) |
$6,000 |
$6,000 |
|
|
|
|
| Police Vehicles |
SR(1) |
$35,000 |
$35,000 |
|
|
|
|
| New Police Station |
|
$500,000 |
$1,000,000 |
$1,500,000 |
$1,500,000 |
|
|
| Uninterupted Power Source |
SR(1) |
$11,980 |
|
|
|
|
|
| Equipment Reserve Fund |
SR |
$12,500 |
$12,500 |
$12,500 |
$12,500 |
$12,500 |
|
| Animal Control Van |
SR |
$6,000 |
$6,000 |
|
|
|
|
| Dispatch Equipment Reserve Fund |
SR(1) |
$5,000 |
$5,000 |
$5,000 |
$5,000 |
$5,000 |
|
| IMC NCIC/Collect (software) |
IOC(2) |
$12,000 |
|
|
|
|
|
|
Ledyard Town Center Committee
|
|
|
|
|
|
|
|
|
|
|
Library ($10,000)
|
|
Sinking Fund Ledyard Library
|
DF |
$10,000
|
$10,000
|
$10,000 |
$10,000 |
$10,000 |
|
| Bill Library Addition |
NEF |
|
$20,000 |
|
|
|
Planning Cost related to updating, reviewing and altering previously
prepared plans |
|
WPCA (Memo) ($257,000)
|
|
High Speed turbo air blower system
|
|
$40,000
|
|
|
|
|
|
| Chemical addition Upgrade/process control |
|
$20,000 |
|
|
|
|
|
| Replace Duff Norton Decantor actuators for sequencing batch reactors |
|
$30,000 |
|
|
|
|
|
| Influent Flow Meter |
|
$7,000 |
|
|
|
|
|
| Thickened solids mixer |
|
$20,000 |
|
|
|
|
|
| Demolition of old plant |
|
$20,000 |
|
|
|
|
|
| Washer/Grinder Unit to replace existing reacher screen |
|
$80,000 |
|
|
|
|
|
| Headworks Upgrade, Concrete Structure |
|
$15,000 |
|
|
|
|
50% funding possible CTDEP |
| SCADA upgrade from Windows 95 |
|
$25,000 |
|
|
|
|
|
| Aljen Heights Water Ext. |
|
|
|
|
|
|
|
| -Phase 3: Route 117-Rt 12 |
|
|
|
$3,860,000 |
|
|
|
| -Phase 4: Interconnect |
|
|
|
|
$1,230,000 |
|
|
|
Board of Education (Spreadsheet)
|
| Bondable Projects |
|
$950,000 |
|
|
|
|
|
| Asbestos Abatement |
1 |
$300,000 |
$300,000 |
|
|
|
District abatement projects; Aternative funding: SDE Grant |
| Playground paving all Elem. |
2 |
$100,000 |
$100,000 |
$200,000 |
|
|
Playgrounds are cracking and have sink holes |
| Electrical Upgrade all Elem. |
1 |
$150,000 |
$150,000 |
$150,000 |
|
|
Classroom power needs exceed capacity |
| Renovate Bathrooms LHS First Floor |
2 |
$300,000 |
|
|
|
|
|
| Dividers LMS |
5 |
|
|
$150,000 |
|
|
$Current dividers are in disrepair; exposing sharp edges |
| Elementary Sch. Roofs |
4 |
|
|
|
|
$2,500,000 |
All roofs done in 1963 |
| LHS Track & Athletic Field Refurbishing |
3 |
|
$1,500,000 |
|
|
|
|
| Storage Building & Lavs by LHS Field |
4 |
$100,000 |
|
|
|
|
|
| Capital & Non-Recurring |
|
|
|
|
|
|
|
| Fuel Tanks |
1 |
$75,000 |
$15,000 |
$10,000 |
$10,000 |
$10,000 |
Replace in ground oil tanks districtwide |
| Science Lab Renovation - LHS |
3 |
$50,000 |
$50,000 |
$50,000 |
$50,000 |
|
Renovation of Existing lab classes; address
address safety issues ($75-$100,000 per class) |
| Upgrade Athletic Fields |
4 |
$10,000 |
$10,000 |
$10,000 |
$10,000 |
$10,000 |
Improvements to LHS and LMS fields |
| Truck Replacemenr |
4 |
$10,000 |
$10,000 |
$10,000 |
$10,000 |
$10,000 |
Sinking Fund New truck every other year
beginning in 2010-2011 |
| Public Address System |
4 |
|
|
|
|
$80,000 |
Update all school intercomm systems
and install VOIP phone system |
| Technology Upgrades |
2 |
$50,000 |
$50,000 |
$50,000 |
$50,000 |
$50,000 |
Replacement & upgrade of current equip. |
| Ceiling Tile-LHS |
2 |
$30,000 |
$30,000 |
$30,000 |
$30,000 |
|
Replace in hallways |
| GHS Cafeteria Tables |
1 |
$11,000 |
|
|
|
|
Install tables in GHS Gym (PTO Match?) |
| LHS Auditorium Upgrades |
3 |
|
|
$30,000 |
$30,000 |
$30,000 |
Light Board, Stage floor, AC |
| Boilers-LHS & LMS |
3 |
|
$60,000 |
$60,000 |
$60,000 |
$60,000 |
Retube boilers at LHS |
| Lockers-LHS |
2 |
$25,000 |
$25,000 |
$25,000 |
$25,000 |
$25,000 |
Athletic Lockers |
| LHS Gym Wall Mats |
2 |
$15,000 |
$15,000 |
|
|
|
Mats wearing out |
|
Town Council
|
|
|
|
|
|
|
|
|
|
|
Public Works ($1,939,000)
|
| Fuel Station Improvements |
DF,SR (H) |
$92,000 |
$91,000 |
$92,000 |
|
|
tanks must be replaced by 2015 (LOCIP? |
| Highway Garage Parking Lot |
DF,RPH(L) |
$80,000 |
|
|
|
|
CNR6 Conveyance |
| Highway Garage Roof |
DF (M) |
$100,000 |
|
|
|
|
DF,SR(LOCIP?) |
Lantern Hiil Road Bridge
Replacement |
RPH, DF, C (M) |
$375,000 |
|
|
|
|
Total Project cost $330,000±; shared with Stonington (LOCIP?) |
Old Ledyard Center Firehouse
Roof Repairs |
DF (M) |
$25,000 |
|
|
|
|
CNR6, Conveyance |
| Pooled Vehicles |
SR(H) |
$5,000 |
$5,000 |
$5,000 |
$5,000 |
$5,000 |
ongoing program CNR6, Conveyance |
| Heavy Equipment |
SR(H) |
$40,000 |
$40,000 |
$40,000 |
$40,000 |
$40,000 |
ongoing program CNR6, Conveyance |
| Large Trucks |
SR(H) |
$55,000 |
$55,000 |
$57,500 |
$57,500 |
$60,000 |
ongoing program CNR6, Conveyance |
| Light Equipment |
SR, IOE(M) |
$15,000 |
$15,000 |
$15,000 |
$15,000 |
$15,000 |
ongoing program CNR6, Conveyance |
| Small Trucks |
SR(H) |
$27,000 |
$27,000 |
$27,000 |
$27,000 |
$27,000 |
ongoing program CNR6, Conveyance |
| Road Restoration |
DF,SR,C (H) |
$750,000 |
$750,000 |
$750,000 |
$750,000 |
$750,000 |
ongoing program |
Sandy Hollow Road Guiderail
Replacement |
RPH, DF, |
$150,000 |
|
|
|
|
(LOCIP?) |
| Town Hall Parking Lot |
DF, C (M) |
$125,000 |
|
|
|
|
CNR6, Conveyance |
| Truck Shelter Improvements |
IOE(L) |
$15,000 |
|
|
|
|
Potential Urban Act Funding |
| Senior Center Roof |
DF(M) |
|
|
$32,000 |
|
|
(LOCIP?) |
| Additional Capital Building Needs |
|
|
|
|
|
|
|
| Senior Center Van |
1 |
$12,000 |
|
|
|
|
Local Share (20% of total cost) |
| Assessor's Office ($56,000) |
| Revaluation |
|
$56,000 |
$56,000 |
$56,000 |
$56,000 |
$56,000 |
|
| Gales Ferry Fire District ($153,500) |
| Fire Truck Replacement |
SR (1) |
$90,000 |
$90,000 |
$90,000 |
$90,000 |
$90,000 |
|
| Breathing App. Bottle Replacement |
SR (1) |
|
$7,000 |
$7,000 |
$7,000 |
$7,000 |
|
| Jaws of Life Pump |
RPH (2) |
$5,500 |
$5,500 |
|
|
|
|
| Firefighting Clothing Replac. |
SR (1) |
$25,000 |
$25,000 |
|
|
|
|
| Ladder Truck Overhaul/refurb. |
RPH (1) |
|
$150,000 |
|
|
|
|
| Ladder Truck's Fire Pump Overhaul |
RPH (1) |
$20,000 |
|
|
|
|
|
| Pickup Truck |
DF (2) |
$13,000 |
|
|
|
|
|
| Ledyard Fire District ($150,000) |
| Apparatus Replacement |
1 |
$90,000 |
$90,000 |
$90,000 |
$90,000 |
$90,000 |
Purchase & Lease Options Possible |
| Apparatus Maintenance and Repair |
1 |
|
$7,000 |
$7,000 |
$7,000 |
$7,000 |
|
| Turnout Gear Replacement |
1 |
$25,000 |
$25,000 |
|
|
|
Ongoing gear replacement program |
| Storage Shed |
|
$5,000 |
|
|
|
|
|
| Security Camaras |
|
$10,000 |
|
|
|
|
|
| Radio Replacement |
1 |
$20,000 |
|
|
|
|
|
| Fire Marshal |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Totals |
|
$3,917,680 |
|
|
|
|
|
|