LEDYARD, CT

Planning & Development Information - Capital Improvements Program

RPH: Risk To Public Health; DF: Deteriorated Facility; SR: Systematic Replacement; IOE: Improvement of Operating Efficiency
C: Coordination; EPS: Equitable Provision of Services, Facilities; NEF: New or Expanded Facilities

Description

Priority

FY 2012

FY 2013

FY 2014 FY 2015 FY 2016

Comments

Planning Department ($65,000)
Former Gales Ferry School-Kitchen Incubator Feasibility Study

$25,000

Potential funding from USDA

Municipal Center/ former Ledyard Center Firehouse Concept Plan $15,000 Funding from existing fund 6
Tablet Computer for Commission Meetings (10) $5,000 Used instead of paper during meetings; could be shared with others

Planning Commission

GIS Sinking Fund

$10,000

$10,000

$10,000 $10,000 $10,000

Survey & Wetlands delination 1025 &
1087 Col. Ledyard Hwy
$10,000 Funded by Urban Act monies
Finance Department ($250,000)
New Financial Software & Hardware $250,000 Short term financing (BANs)
MIS
Replacement of Town Hall Network Cabling

Police Department

Computer Equipment

$5,000

$5,000

$5,000 $5,000 $5,000

911 Room AC Vent $5,000
Police Vehicles $35,000 $35,000
New Police Station $500,000 $1,000,000 $1,500,000 $1,500,000

Ledyard Town Center Committee

Library

Sinking Fund Ledyard Library

DF

$10,000

$10,000

$10,000 $10,000 $10,000

Cost of large maintenance/repairs: new entrance door, electrical
upgrade, furnace, roof

Bill Library Addition NEF $20,000 Planning Cost related to updating, reviewing and altering previously
prepared plans

WPCA (Memo)

High Speed turbo air blower system

$100,000

Automatic Dissolved Oxygen Controllers $15,000
Replace Duff Norton Decantor actuators for sequencing batch reactors $30,000
Influent Flow Meter $6,500
Thickened solids mixer $20,000
Demolition of old plant $20,000
Washer/Grinder Unit to replace existing reacher screen $80,000
Facilities Plan (Phase 2) $125,000 50% funding possible CTDEP
SCADA upgrade from Windows 95 $12,500
Aljen Heights Water Ext.
-Phase 1: Avery Hill Rd $1,950,000
-Phase 2: Aljen Heights $2,900,000
-Phase 3: Route 117-Rt 12 $3,860,000
-Phase 4: Interconnect $1,230,000

Board of Education (Spreadsheet)

Bondable Projects
Asbestos Abatement RPH $300,000 $300,000 $300,000 District abatement projects; Aternative funding: SDE Grant

Bleachers at LHS

DF

$325,000

2006 Quote

Conversion to Natural Gas DF $175,000 Convert from oil to natural gas; Alternative Funding:
Conservation Grant
Playground paving all Elem. DF $200,000 $200,000 $200,000 Playgrounds are cracking and have sink holes
Electrical Upgrade all Elem. DF $150,000 $150,000 $150,000 Classroom power needs exceed capacity
Storage Building & Lavs. LHS Field NEF $100,000 $No storage facilities in district; no lavs. by football field
Dividers LMS DF $150,000 $Current dividers are in disrepair; exposing sharp edges
Elementary Sch. Roofs $2,500,000 All roofs done in 1963
Capital & Non-Recurring
Fuel Tanks DF $10,000 $10,000 $50,000 $10,000 $10,000 Replace in ground oil tanks districtwide
Science Lab Renovation - LHS DF $50,000 $75,000 $75,000 $75,000 $75,000 Renovation of Existing lab classes; address
address safety issues ($75-$100,000 per class)
Upgrade Athletic Fields DF $10,000 $10,000 $10,000 $10,000 $10,000 Improvements to LHS and LMS fields
Truck Replacemenr $5,000 $5,000 $5,000 $5,000 $5,000 Sinking Fund New truck every other year
beginning in 2010-2011
Public Address System RPH/DF $100,000 $100,000 $60,000 Update all school intercomm systems
especially LHS and LMS
Technology Upgrades SR $50,000 $50,000 $50,000 $50,000 $50,000 Replacement & upgrade of current equip.
Ceiling Tile-LHS DF $30,000 $30,000 $30,000 $30,000 $30,000 Replace in hallways
Classroom Furniture-District $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 Longterm replacement plan has not been funded for
many years; Most furniture in district purchased when
schools were constructed
Air Quality-All Schools RPH $15,000 $15,000 $10,000 $15,000 Multiple projects to control mold in various
schools; dehumidifers, radon remediation, ...
ADA Hardware RPH $20,000 $20,000 $20,000 Install door and other hardware to meet ADA require.
Skylight, exhaust & ceiling fans- LMS DF $75,000 Improve air quality and release heat,
when needed
Air circulators in clusters-LMS DF $45,000 30 yr old circulators are inefficient
and noisy
Boilers-LHS DF $40,000 $80,000 Retube boilers at LHS
Expand Parking Lot-LHS NEF $50,000 Parking for an additional 60 vehicles
is needed for music/athletic events
Lockers-LHS DF $40,000 $5,000 $5,000 $5,000 $5,000 Athletic Lockers

Town Council

Public Works

Fuel Station Canopy $52,500 cost to date $900
Highway Garage Parking Lot $50,000
Highway Garage Roof $100,000
Highway Garage Mezzanine $45,000 Funded by Urban Act
Lantern Hiil Road Bridge
Replacement
$150,000
Old Ledyard Center Firehouse
Roof Repairs
$25,000
Pooled Vehicles $5,000 $5,000 $5,000 $5,000 $5,000 ongoing program
Heavy Equipment $40,000 $40,000 $40,000 $40,000 $40,000 ongoing program
Large Trucks $50,000 $52,500 $52,500 $55,000 $55,000 ongoing program
Light Equipment $15,000 $15,000 $15,000 $15,000 $15,000 ongoing program
Small Trucks $27,000 $27,000 $27,000 $27,000 $27,000 ongoing program
Road Restoration $750,000 $750,000 $750,000 $750,000 $750,000 ongoing program
Sandy Hollow Road Guiderail
Replacement
$150,000
Senior Center Roof $32,000
Senior Center Windows $23,000
Town Hall Parking Lot $125,000
Truck Shelter Improvements $15,000
Senior Center (Letter)
Window Replacement (30) $27,000
Carpet Replacement $10,000
Assessor's Office
Gales Ferry Fire District
Fire Truck Replacement $70,000 $70,000 $70,000 $70,000 $70,000
Fire Hose Dryer $13,500
Fire Hose $6,000
Firefighting Clothing $25,000 $25,000
Rescue Boat $20,000
Ledyard Fire District
Apparatus Replacement: Engine Tanker 14 1 $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 approved FY 2011; Purchase & Lease Options Possible
Apparatus Maintenance and Repair-Rescue R-17 1 $13,000 $10,000 $10,000 $10,000 $10,000 $10,000 approved FY 2011; Necessary body work Rescue R-17; replacement of strobe emergency lights with LED technology
Turnout Gear Replacement 1 $20,000 $20,000 $20,000 $20,000 $20,000 Ongoing gear replacement program
Fire Marshal
Exhaust System Repair 1 $7,000 Repair of damaged vehicle exhaust system
MIS
Replacement of Town Hall Network Cabling 1 $10,000 10/100/1000 3gb switch: $2,800; wireless router: $2,000; CAT 6 Cable: $2,200
Totals $8,872,000 $3,304,500 $7,584,500 $4,099,000 $3,968,000